Location: US Navy Naval Station, Rota, Spain.
Client: Naval Facilities Engineering Command, US Navy
Main project features:
Breakwater repair. 3t
rocks. 8t, 16t and 25t tetrapods. 110t blocks. Dredging.
Actividades realizadas:
In charge of all on site operations, working with contractors and
subcontractors and ensuring the building contract runs to schedule. A site
manager controls all aspects of the site including planning work, arranging
delivery of materials and managing a range of subcontractors, and is ultimately
responsible for ensuring a contract is delivered on time.
Lifting the first block to transport it from the production area to the boarding area.
Towing the
barge with rockfill to the downloading area. Being a breakwater repair project the
rocks were placed in the spots previously designated by bathymetry and divers.