Location: US Navy Naval Station, Rota, Spain.
Client: Naval Facilities Engineering Command, US Navy.
Main project features:
Activities performed:
Perform a technical, organizational
and supervisory role.
Partial view of the operations area with the service building, the technical building with the filtration system and the two 5,000m3 fuel tanks.
Operation
platform under construction. It was built with the same technique as used in the
apron but the slab thickness was 20cm instead of 40cm.
Pouring concrete
on the first 5.000m3 slab foundation.