ENROUTE ROTA AIRFIELD IMPROVEMENTS

Year:  2004 – 2005
Location:  US Navy Naval Station, Rota, Spain.
Client: Naval Facilities Engineering Command, US Navy.
Main project features:
7 km of pipeline, two 5.000m3 tanks, Pumping Station, Fire Station, apron for 15 spots C-5 Galaxy aircraft type, VTOL aircraft engine test platform and weapons load platform.
Position held:  Site Engineer.



Activities performed:
Perform a technical, organizational and supervisory role.


Partial view of the operations area with the service building, the technical building with the filtration system and the two 5,000m3 fuel tanks.
Operation platform under construction. It was built with the same technique as used in the apron but the slab thickness was 20cm instead of 40cm.











Pouring concrete on the first 5.000m3 slab foundation.